Ford Werke AG, Cologne

Engineering of the control unit of a new dosing/high voltage technology for a Primer ESTA
- Engineering of the switchgear
- Delivery and installation
- Extension and modification of the existing sweatgear

Ford Werke AG, Cologne

Engineering, delivery and installation of the switchgear (approx. 9 meter) for the level detection and control of a tank farm.
- Engineering of the switchgear
- Extension and modification of the existing sweatgear
- Installation of cable ducts and cabling of the installtion
- Support during commissioning

Ford Werke AG, Cologne

Engineering of the switchgear (approx. 6 meter) for the control of slide valves according to WHG
- Engineering of the switchgear
- Installation of cable ducts and cabling of the installation
- Support during commissioning

Ford Werke AG, Saarlouis

Engineering of the switchgear for the control of a PVC supply
- Engineering of the switchgear
- Extension and modification of the existing sweatgear

Ford Werke AG, Saarlouis

Engineering of the control for a new Berger dosing technology for a paint line
- Engineering, delivery and installation of the switchgear
- Modification and extension of the existing switchgear
- Cabling of the installation
- Support during commissioning

Ford Werke AG, Saarlouis

Modification of the existing control of a Ransmate paint line
- Assembly of a new control unit
- Cabling of the installation
- Support during commissioning
- Modification of the existing control